Chat-Led Lead Capture Pre-Launch Checklist for Pricing and Contracts
Quick summary & recommended workflow — chat-led lead capture pre-launch checklist for pricing and contracts
This quick summary outlines a practical procurement workflow and the minimum items to confirm before going live with a chat-led lead capture system. Use this chat-led lead capture pre-launch checklist for pricing and contracts to accelerate sign-off, reduce legal and operational risk, and lock down expected costs. The goal: move from evaluation to purchase and live test within a predictable procurement timeline.
Below is a compact, action-oriented plan you can run through with legal, engineering, marketing, and operations — designed to resolve questions about pricing tiers, conversation limits, API quotas, contract terms (including DPA/SLA language), and internal readiness like CRM/calendar access and attribution testing.
Why this checklist matters for procurement
Procurement teams need clarity on cost drivers and contractual obligations so stakeholders can approve budget and accept reasonable risk. This section explains the core drivers that commonly delay sign-off and how the checklist resolves them. Use the checklist as a negotiation and validation tool during vendor evaluation to avoid surprise spend or integration hold-ups.
Think of it as a chat-led lead capture pricing and contract checklist that teams can use to compare vendors objectively and shorten review cycles.
- Clarifies recurring vs. variable costs (conversation volumes, API usage).
- Defines measurable acceptance criteria in contracts (SLAs, uptime, error handling).
- Establishes compliance controls up front (DPA language, consent text).
- Aligns technical prerequisites (CRM/calendar access, API keys, throughput) so integration doesn’t stall.
How to use this checklist during vendor evaluation
Adopt a staged approach: shortlist, negotiate, pilot, measure, and sign. Start every vendor conversation by mapping their pricing model and contract obligations to your expected conversation volumes and peak throughput. Keep the pre-launch checklist for chat-led lead capture handy as an evaluation template and as a scoring rubric during demos and vendor responses.
This article also explains how to evaluate chatbot pricing tiers, conversation limits and API quotas before launch so you can produce an apples-to-apples cost model for finance.
- Score pricing clarity: can the vendor show cost at your expected volume tier?
- Validate contract terms: request DPA, SLAs, and termination clauses early.
- Confirm technical readiness: API quotas, CRM access, and calendar sync requirements.
- Plan the pilot: defined attribution test plan and measurement period.
Pricing tiers and conversation limits: what to lock in
Understand the vendor’s pricing levers so you can model realistic costs. Ask vendors to map their tiers to your projected conversation volume, peak concurrency, and retention window. Vendors that provide transparent tiered pricing and overage rates reduce procurement friction and give finance teams confidence in forecasting.
- Request a cost estimate based on realistic monthly active conversations and anticipated peaks.
- Get written overage pricing and a definition of what constitutes a billable “conversation.”
- Negotiate a grace or trial period for unexpected ramp during launch.
API quotas, throughput caps, and integration limits
APIs and throughput constraints can break a launch if not validated. Define expected API calls per conversation, peak requests per minute, and acceptable latency. Confirm whether the vendor can raise quotas quickly during the pilot or if changes require a formal contract amendment.
Prioritize API quotas, rate limits & throughput planning in your assessment so engineering can scope mitigation and retry logic before go-live.
- Document current CRM integration needs and projected API call volume.
- Require a written commitment on throughput or a temporary quota increase for launch.
- Include rollback and mitigation steps in case of throttling or degraded performance.
Data Processing Addendum (DPA), consent text, and privacy checks
Ensure the vendor provides a clear DPA and sample consent language to use in the chat UI. Legal teams will want to see data handling, subprocessors, retention policies, and breach notification timelines spelled out. Getting DPA language early speeds legal review and reduces surprises at contract stage.
Ask the vendor for a Data Processing Addendum (DPA) & consent language you can plug into the chat UI and the privacy page — that accelerates legal sign-off and gives product a ready-to-use copy.
- Request the DPA and sample customer-facing consent text during RFP.
- Confirm data residency and subprocessor lists if regional compliance is required.
- Define retention limits and data deletion procedures in the contract.
Calendar and CRM access prerequisites
Determine exact integration points and the required permission levels well before engineering begins work. Calendar and CRM access are frequent blockers; include scopes, test accounts, and admin permissions in the checklist to avoid delays.
- List required API scopes for CRM and calendar systems and provide test accounts.
- Define data mappings: which chat fields map to CRM lead fields and how duplicates are handled.
- Plan for failover: what happens if CRM or calendar write calls fail during lead capture.
Attribution test plan and measurement period
Before signing, agree on a short, instrumented pilot that demonstrates measurable lift and accurate attribution. Define conversion windows, UTM conventions, and the measurement period so marketing and analytics can validate results and sign off quickly.
- Agree on KPIs and the measurement period (e.g., 30 days post-launch).
- Instrument UTM parameters and set up test conversions in your analytics and CRM.
- Prepare an attribution test plan that includes control groups or baseline traffic to compare performance.
Stakeholder training, playbooks, and runbooks
Operational readiness is as important as contract clarity. Prepare stakeholder playbooks and short training sessions so sales, marketing, and support teams know how chat leads are routed, qualified, and followed up. These materials reduce friction at go-live and support faster adoption.
Turn the items in this article into a pre-launch readiness plan: CRM/calendar access, attribution tests, stakeholder training and playbooks to hand to ops and sales as part of rollout documentation.
- Create a one-page routing playbook for sales and an escalation runbook for ops.
- Schedule a short training for users who will manage chat leads in the CRM.
- Document common failure modes and the internal contact list for quick resolution.
Contract red flags and negotiation priorities
Focus negotiations on a small set of high-impact items: clear pricing and overage rules, SLA uptime and remedies, DPA/compliance language, and an exit/termination clause that protects your data. Pushing for clarity on these points typically shortens legal review cycles.
Insist on SLA, uptime & performance guarantees with measurable remedies, and avoid vague uptime commitments that offer no practical recourse.
Use a vendor contract checklist for chat-led lead capture: DPA, SLAs, liability & termination terms to keep negotiations focused and to ensure each party knows what’s non-negotiable.
- Watch for vague definitions of billable events or hidden fees.
- Insist on measurable SLAs with remedies for repeated downtime.
- Clarify data ownership and deletion rights on termination.
Sample two-week procurement timeline to sign and launch
Use a tight, predictable procurement timeline to maintain momentum. A compressed example:
- Day 1–2: Vendor scoring, pricing confirmation, and DPA request.
- Day 3–5: Legal review of DPA/SLA and technical validation of API/CRM access.
- Day 6–9: Pilot configuration, test accounts, and attribution instrumentation.
- Day 10–14: Run pilot, validate KPIs, finalize contract, and schedule go-live.
Final pre-launch signoff checklist
Before flipping the switch, confirm the items below and collect stakeholder signoff. This reduces last-minute pauses and ensures cross-functional alignment.
- Pricing and overage rules documented and approved by finance.
- DPA and SLAs signed by legal; sample consent text approved by privacy.
- API quotas verified; test accounts and CRM/calendar integration validated by engineering.
- Attribution test plan running and initial results acceptable to analytics.
- Stakeholder training completed and playbooks distributed.
Treat this as your chatbot procurement checklist for pricing, contracts and readiness and circulate the one-page summary to legal, engineering, finance, and ops before approval. Run this checklist through your stakeholders as an executive summary to speed procurement and reduce launch risk. Treat the list as a living document — update it with vendor-specific items discovered during evaluation. Using a concise pre-launch checklist for chat-led lead capture and a short procurement timeline helps teams focus on the few contract and technical items that most commonly block sign-off.
Leave a Reply